Total office shop reinstatement to original condition. Services include:
Hacking & disposal of all wall & flooring tiles (50MM depth – concrete level)
Demolition & disposal of shop outlet renovated fixtures fittings partitions & ceiling
Hacking removal & disposal of tiled flooring cement screed & make good floor plastering
Demolish & disposal all outlet furniture display counters & shop work stations equipment
Breaking dismantle removal of all built in carpentry equipment including all piping/lightings & connections
Disconnecting termination removal of all internal electrical wiring trunking outlets & power points from DP box.
Dismantle removal & disposal of shop front & internal feature walls & make good walls – optional/if required.
Reinstate sprinkler system back to landlord’s primary layer system & conduct sprinkle discharge as required.
Make good internal walls plaster paint removed racking/partition – Wall & Ceiling Basic white wash.
Supply & install hoarding for shop front exterior perimeter & white vinyl sticker on back glass walls
Disposal of debris racks timber metal gate glass water pipes plumbing movable equipment if any.